| NO. |
Project |
Main Contractor |
Scope Of Work |
Period |
Sub-contract Sum(HKS) |
| 1 |
CED Contract No.CV/94/06
Tuen Mun Area 38 Special Industries Area
Development-Reclamation and Construction
Roads and Drains, Stage 1 |
Dredging International |
Installation of Seawall Block |
Apr 96-Nov 96 |
6,400,000.00 |
| 2 |
Contract No.TW/91/95 |
Penta Ocean Construction Co. |
Rock Placing& Installation of
Seawall Block |
Nov 96-Apr 97 |
2,000,000.00 |
| 3 |
Contract No.AA452
New Airport At Chek Lap Kok
Sea Rescue Facilities |
China States Construction
Eng. Ltd. |
Rock Placing& Installation Of
Seawall Block |
Jun 97-Nov97 |
3,570,00.00 |
| 4 |
Contract No. TMTL, 393
River Trade Terminal Tuen Mun Area 38
Main Civil Contract |
Zen Pacific-Dredging Int’1Joint Venture |
Rock Placing & Installation Of
Seawall Block |
Mar97-Oct99 |
41,924,000.00 |
| 5 |
Contract No.CV/97/03
Pak Shek Kok Reclamation Phase 2 |
Ho Hon Construction & Eng.Ltd. |
Laying Of Geotextile &
Installation Of Seawall Blocks |
Apr98-Oct99 |
5,000,000.00 |
| 6 |
Contract No.Nl9/98
Tung Chung Development Phase 3a
Reclamation For Areas 51, 52(Part)To 56 |
Hyundai Engineering & Const. Co. Ltd. |
Construction Of
Sloping/Vertical Seawall & Installation Of Marine Pbd |
May99-Apr03 |
50,260,000.00 |
| 7 |
Reinstatement Of Temporary Works Areas
Form The Soth Portal Of Tai Lam Tunnel To
The Gemini Beach-Area D3
Gemini Beach Jetty(Phase 2) |
Dragages Et Travaux Publics (Hk) Ltd. |
Reinstatement Of Beach |
Feb00-Sep00 |
1,150,000.00 |
| 8 |
Contract No.WB/ASD/SSH320
Reprovisioning Of Cuhk’S Laboratory
At Pak Shek Kok
Construction Of Landing And Slipway |
Hung Mau Realty & Construction Ltd. |
Construction Of Vertical Seawall & Slipway |
Mar/00-Dec00 |
5,000,000.00 |
| 9 |
Foundation Work For Proposed Residential
Development At TMTL419
Siu Lam, Tuen Mun, N.T |
Kin Wing Engineering Co. Ltd. |
Construction Of Vertical
Seawall |
May00-Apr01 |
9,347,006.00 |
| 10 |
Contract No.16/WSD/99
Construction Of Yau Tong No. 2
Fresh Water Service Reservoir |
Lam Construction Co. Ltd. |
Site Formation |
Jul00-Oct02 |
11,841,000.00 |
| 11 |
Proposed Ma Wan Infrastructure
Construction Of Tung Wan Pier & Associated
Reclamation Works
Dredging And Reclamation Works |
Gamfield Construction Co. Ltd. |
Construction Of Vertical
Seawall & Reclamation |
Sep00-Apr02 |
13,812,320.00 |
| 12 |
Kwai Chung Container Port
Terminal 9 Development
Submarine Sewage Outfalls And
Diversion Of Kwai Chung Weastern Diffuser |
Hyundai-Ccecc Joint Venture |
Submarine Outfall Pipes And Western Diffuser Pipe |
Aug00-Jun01 |
9,717,194.00 |
| 13 |
Contract No. Is 11/2000
Peng Chau Development Pakcage 3
Remaining Reclamation And Roads And Drains |
Pollard Construction Co. Ltd. |
Construction Of Vertical
Seawall |
Dec00-Aug02 |
6,654,000.00 |
| 14 |
Contract No.NSB-Cs6
Hong Kong Station Development
Northern Site Basement |
E Man-Sanfield Jv Construction Co. Ltd. |
Disposed Of Excavated
Material By Barge |
Mar00-Oct01 |
2,280,000.00 |
| 15 |
Contract No. CV/2000/01
Then Mun Area 38 Reclamation, Stage 2 |
Penta-Ocean Construction Co. Ltd. |
Installation Of Seawall Blocks And Laying Of Geotextile |
Mar01-Aug03 |
7,748,930.00 |
| 16 |
Contract No. DC/99/02
Construction Of Replacement Outfall And
Sludge Dewatering Facilities At Cheung Chau Sewage Treatment Works |
China Road And Bridge Corp. |
Construction Of
Submarine Outfall |
May01-Aug02 |
6,084,775.00 |
| 17 |
Contract No. 33/WSD/2000
Infrastructure For Penny’S Bay Development
Package 1- Construction Of Yam O Tuk Fresh
Water Service Reservoir And Associated Works |
Chun Wo Construction & Engineering Co. Ltd |
Disposal Of Excavated Materials By Land Transport |
Oct01-Dec03 |
7,631,000.00 |
| 18 |
Contract No CV/2000/09
Infrastructure For Penny’s Bay Development
Contract 1 |
China State Construction Engrg.
(Hong Kong) Ltd. |
Construction Of Seawall At Western Channel |
Dec01-Oct02 |
24,174,000.00 |
| 19 |
Contract No. CV/2000/09
Infrastructure For Penny’S Bay Development
Contract 1 |
China State Construction Engrg.
(Hong Kong) Ltd. |
Marine Transportation Of CDG From Former Kai Tak Airport To Penny’S Bay |
Apr02-Dec04 |
20,666,000.00
(Disposal Qty 2,550,000ton |
| 20 |
CV/2001/05
Reclamation In North Tsing Yi |
Gammon Skanska Ltd. |
Seawall, Reclamation And Earthwork |
Apr02-Sep03 |
36,596,000.00 |
| 21 |
Contract No. HCC300
KCRC East Rail Extention
East Tsim Sha Tsui Station |
Gammon Nishimatsu Joint Venture |
Management&Operation Of Barging Point And Marine Disposal |
Jun01-Aug04 |
11,446,000.00 |
| 22 |
Contract No. HY/2000/02
Castle Peak Road Improvement
Between Area 2 And Ting Kau, Tsuen Wan
Marine Work |
China State Construction Engrg. Corp. |
Construction Of Seawall & Retaining Wall |
Jan02-Dec04 |
4,027,000.00 |
| 23 |
Contract No.CV/2002/04
Penny’s Bay Reclamation Stage 2 |
Gammon Construction Ltd. |
Construction Of Sloping Seawall & Reclamation |
Apr03-Jan08 |
184,360,000.00 |
| 24 |
Contract No. HY/2003/04
Design & Build Of Improvement To Castle
Peak Rd Between Ka Loon Tsuen & Siu Lam
|
Gammon Construction Ltd. |
Excavation, Reclamation & Construction Seawall |
Aug04-Aug06 |
29,961,000.00 |
| 25 |
Contract No. CV/2000/06
Formation And Associated Infrastructure Works
Near Choi Wan Rd And Jordan Valley |
China State Construction Engrg. Corp. |
Marine Transportation Rock Fill To Shek O |
Mar05-Mar06 |
8,316,000.00
(Disposal Qty 481,000m3) |
| 26 |
Contract No. DC/2004/08
Upgrading Of Peng Chau Sewage Treatment Works
|
Necso-ATAL JV |
Marine Works & Submarine Outfall |
Jun05-Jun06 |
4,285,000.00 |
| 27 |
Contract No. HY/2001/06
Route 8 – Nam Wan Tunnel Works |
Gammon Construction Ltd. |
Disposal Of Residual Fine To East Sha Chau |
Sep05-Dec05 |
4,833,000.00
(Disposal Qty 530,000ton) |
| 28 |
Contract No. KDB200
Kowloon Southern Link
Jordan Road To East Tsim Sha Tsui |
Link 200 Joint Venture (Leighton-Balfour Beatty-Kumagai-
John Holland JV) |
Management & Operation Of Barging Point And Disposal Of Surplus Material |
Dec05-Mar08 |
13,650,000.00
(Disposal Qty 798,000m3)
|
| 29 |
Hy/2005/06
Castle Peak Road Improvement
West Of Tsing Lung Tau |
Chun Wo Construction & Engineering Co. Ltd |
Marine Work – Seawall Construction |
Feb06-Oct07 |
5,500,000.00 |
| 30 |
CLP Power Cable Tunnel Projects
Chi Ma Wan Cable Tunnel And Tuen Mun River Crossing |
Dragages(HK) Joint Venture |
Demolition Of Temporary Marine Working Platform At Tai Long Wan |
Feb06-May06 |
2,426,000.00 |
| 31 |
Cv/2006/06 Seawall Upgrading Works For Ma On Shan
Waterfront Promenade |
Concentric Construction Ltd. |
Hoarding, 2004m Seawall Upgrading Works And Misc. |
May07-Present |
22,500,000.00 |
| 32 |
Contract No.-C105
Site Formation, Funicular Tunnel & Miscellaneous Works |
Dragages-Bouygues JV |
Disposal Of Excavated Material |
Aug07-Present |
9,471,000.00 |
| 33 |
Hk12/02 Central Reclamation Phase Ⅲ |
Leighton-China Stat-Van Oerd JV |
Placement Of Leveling Stone Seawall Blocks And Type A |
Sep07-Present |
11,826,000.00 |
| 34 |
Contract No. DC/2007/17
Drainage Improvement Works In Cheung Po, Ma On, Tin Sam Tsuen Of Yuen Long & Sewerage |
China Road And Bridge Corporation |
Supply Of Rock Fill & Disposal Of Marine Mud |
April-Present |
1,100,000.00 |
| 35 |
Ep/Sp/9/91 Development & Manag’T Of Went Landdill |
Swire SITA Waste Services |
Maintenance Dredging |
May-Present |
2,065,000.00 |
|