Marine Engineering Projects
Note:Catalog is PDF format:Download Software(PDF Reader)
 

Projects Consultancy-Marine Engineering Projects
 
NO. Project Main Contractor Scope Of Work Period Sub-contract Sum(HKS)
1

CED Contract No.CV/94/06
Tuen Mun Area 38 Special Industries Area
Development-Reclamation and Construction
Roads and Drains, Stage 1

Dredging International Installation of Seawall Block Apr 96-Nov 96 6,400,000.00
2 Contract No.TW/91/95 Penta Ocean Construction Co.

Rock Placing& Installation of
Seawall Block

Nov 96-Apr 97 2,000,000.00
3

Contract No.AA452
New Airport At Chek Lap Kok
Sea Rescue Facilities

China States Construction Eng. Ltd. Rock Placing& Installation Of
Seawall Block
Jun 97-Nov97 3,570,00.00
4 Contract No. TMTL, 393
River Trade Terminal Tuen Mun Area 38
Main Civil Contract
Zen Pacific-Dredging Int’1Joint Venture Rock Placing & Installation Of
Seawall Block
Mar97-Oct99 41,924,000.00
5 Contract No.CV/97/03
Pak Shek Kok Reclamation Phase 2
Ho Hon Construction & Eng.Ltd. Laying Of Geotextile &
Installation Of Seawall Blocks
Apr98-Oct99 5,000,000.00
6 Contract No.Nl9/98
Tung Chung Development Phase 3a
Reclamation For Areas 51, 52(Part)To 56
Hyundai Engineering & Const. Co. Ltd. Construction Of
Sloping/Vertical Seawall & Installation Of Marine Pbd
May99-Apr03 50,260,000.00
7 Reinstatement Of Temporary Works Areas
Form The Soth Portal Of Tai Lam Tunnel To
The Gemini Beach-Area D3
Gemini Beach Jetty(Phase 2)
Dragages Et Travaux Publics (Hk) Ltd. Reinstatement Of Beach Feb00-Sep00 1,150,000.00
8 Contract No.WB/ASD/SSH320
Reprovisioning Of Cuhk’S Laboratory
At Pak Shek Kok
Construction Of Landing And Slipway
Hung Mau Realty & Construction Ltd. Construction Of Vertical Seawall & Slipway Mar/00-Dec00 5,000,000.00
9 Foundation Work For Proposed Residential Development At TMTL419 Siu Lam, Tuen Mun, N.T Kin Wing Engineering Co. Ltd. Construction Of Vertical
Seawall
May00-Apr01 9,347,006.00
10 Contract No.16/WSD/99
Construction Of Yau Tong No. 2
Fresh Water Service Reservoir
Lam Construction Co. Ltd. Site Formation Jul00-Oct02 11,841,000.00
11 Proposed Ma Wan Infrastructure
Construction Of Tung Wan Pier & Associated
Reclamation Works
Dredging And Reclamation Works
Gamfield Construction Co. Ltd. Construction Of Vertical
Seawall & Reclamation
Sep00-Apr02 13,812,320.00
12 Kwai Chung Container Port
Terminal 9 Development
Submarine Sewage Outfalls And
Diversion Of Kwai Chung Weastern Diffuser
Hyundai-Ccecc Joint Venture Submarine Outfall Pipes And Western Diffuser Pipe Aug00-Jun01 9,717,194.00
13 Contract No. Is 11/2000
Peng Chau Development Pakcage 3
Remaining Reclamation And Roads And Drains
Pollard Construction Co. Ltd. Construction Of Vertical
Seawall
Dec00-Aug02 6,654,000.00
14 Contract No.NSB-Cs6
Hong Kong Station Development
Northern Site Basement
E Man-Sanfield Jv Construction Co. Ltd. Disposed Of Excavated
Material By Barge
Mar00-Oct01 2,280,000.00
15 Contract No. CV/2000/01
Then Mun Area 38 Reclamation, Stage 2
Penta-Ocean Construction Co. Ltd. Installation Of Seawall Blocks And Laying Of Geotextile Mar01-Aug03 7,748,930.00
16 Contract No. DC/99/02
Construction Of Replacement Outfall And
Sludge Dewatering Facilities At Cheung Chau Sewage Treatment Works
China Road And Bridge Corp. Construction Of
Submarine Outfall
May01-Aug02 6,084,775.00
17

Contract No. 33/WSD/2000
Infrastructure For Penny’S Bay Development
Package 1- Construction Of Yam O Tuk Fresh
Water Service Reservoir And Associated Works

Chun Wo Construction & Engineering Co. Ltd Disposal Of Excavated Materials By Land Transport Oct01-Dec03 7,631,000.00
18 Contract No CV/2000/09
Infrastructure For Penny’s Bay Development
Contract 1
China State Construction Engrg.
(Hong Kong) Ltd.
Construction Of Seawall At Western Channel Dec01-Oct02 24,174,000.00
19 Contract No. CV/2000/09
Infrastructure For Penny’S Bay Development
Contract 1
China State Construction Engrg.
(Hong Kong) Ltd.
Marine Transportation Of CDG From Former Kai Tak Airport To Penny’S Bay

Apr02-Dec04

20,666,000.00
(Disposal Qty 2,550,000ton
20 CV/2001/05
Reclamation In North Tsing Yi
Gammon Skanska Ltd. Seawall, Reclamation And Earthwork Apr02-Sep03 36,596,000.00
21 Contract No. HCC300
KCRC East Rail Extention
East Tsim Sha Tsui Station
Gammon Nishimatsu Joint Venture Management&Operation Of Barging Point And Marine Disposal Jun01-Aug04 11,446,000.00
22 Contract No. HY/2000/02
Castle Peak Road Improvement
Between Area 2 And Ting Kau, Tsuen Wan
Marine Work
China State Construction Engrg. Corp. Construction Of Seawall & Retaining Wall Jan02-Dec04 4,027,000.00
23 Contract No.CV/2002/04
Penny’s Bay Reclamation Stage 2
Gammon Construction Ltd. Construction Of Sloping Seawall & Reclamation Apr03-Jan08 184,360,000.00
24 Contract No. HY/2003/04
Design & Build Of Improvement To Castle
Peak Rd Between Ka Loon Tsuen & Siu Lam
Gammon Construction Ltd. Excavation, Reclamation & Construction Seawall Aug04-Aug06 29,961,000.00
25 Contract No. CV/2000/06
Formation And Associated Infrastructure Works
Near Choi Wan Rd And Jordan Valley
China State Construction Engrg. Corp. Marine Transportation Rock Fill To Shek O Mar05-Mar06 8,316,000.00
(Disposal Qty 481,000m3)
26

Contract No. DC/2004/08
Upgrading Of Peng Chau Sewage Treatment Works

Necso-ATAL JV Marine Works & Submarine Outfall Jun05-Jun06 4,285,000.00
27 Contract No. HY/2001/06
Route 8 – Nam Wan Tunnel Works
Gammon Construction Ltd. Disposal Of Residual Fine To East Sha Chau Sep05-Dec05 4,833,000.00
(Disposal Qty 530,000ton)
28 Contract No. KDB200
Kowloon Southern Link
Jordan Road To East Tsim Sha Tsui
Link 200 Joint Venture (Leighton-Balfour Beatty-Kumagai-
John Holland JV)
Management & Operation Of Barging Point And Disposal Of Surplus Material Dec05-Mar08 13,650,000.00
(Disposal Qty 798,000m3)
29 Hy/2005/06
Castle Peak Road Improvement
West Of Tsing Lung Tau
Chun Wo Construction & Engineering Co. Ltd Marine Work – Seawall Construction Feb06-Oct07 5,500,000.00
30 CLP Power Cable Tunnel Projects
Chi Ma Wan Cable Tunnel And Tuen Mun River Crossing
Dragages(HK) Joint Venture Demolition Of Temporary Marine Working Platform At Tai Long Wan Feb06-May06 2,426,000.00
31 Cv/2006/06 Seawall Upgrading Works For Ma On Shan
Waterfront Promenade
Concentric Construction Ltd. Hoarding, 2004m Seawall Upgrading Works And Misc. May07-Present 22,500,000.00
32 Contract No.-C105
Site Formation, Funicular Tunnel & Miscellaneous Works
Dragages-Bouygues JV Disposal Of Excavated Material Aug07-Present 9,471,000.00
33 Hk12/02 Central Reclamation Phase Ⅲ Leighton-China Stat-Van Oerd JV Placement Of Leveling Stone Seawall Blocks And Type A Sep07-Present 11,826,000.00
34 Contract No. DC/2007/17
Drainage Improvement Works In Cheung Po, Ma On, Tin Sam Tsuen Of Yuen Long & Sewerage
China Road And Bridge Corporation Supply Of Rock Fill & Disposal Of Marine Mud April-Present 1,100,000.00
35 Ep/Sp/9/91 Development & Manag’T Of Went Landdill Swire SITA Waste Services Maintenance Dredging May-Present 2,065,000.00